Site group
Caldecott / Upper Broadway mitigation corridor
11child projects
48mentions
2003first mention
2020last mention
Why Group These
Umbrella program group for the Caldecott fourth bore and related mitigation, streetscape, road-diet, bike/pedestrian, soundwall, and Highway 24 corridor projects.
This is not a single parcel. It is a corridor-impact program where the projects are linked by Caldecott/Highway 24 impacts and mitigation.
Outcome Mix
4 proposed3 under-construction2 in-review2 approved
Child Projects
| Project | Mentions | Span | Stance | Outcome |
|---|---|---|---|---|
| Caldecott Tunnel 4th Bore | 23 | 2003_01 to 2010_06 | opposed | under-construction |
| Upper Broadway corridor streetscape/road diet | 1 | 2005_07 to 2005_07 | supported | proposed |
| Highway 24 rubberized asphalt repaving | 1 | 2005_10 to 2005_10 | supported | under-construction |
| Upper Broadway bike and traffic lane redesign | 1 | 2006_09 to 2006_09 | neutral | proposed |
| Broadway road diet and Caldecott intersection improvements | 12 | 2010_10 to 2020_06 | supported | under-construction |
| SR 24 Soundwall studies | 4 | 2012_09 to 2013_01 | mixed | proposed |
| Broadway/Keith and Broadway/Brookside/SR24 intersection improvements | 1 | 2013_02 to 2013_02 | supported | proposed |
| Broadway/Keith to Broadway/Golden Gate Way redesign | 1 | 2013_03 to 2013_03 | supported | in-review |
| Broadway road diet and streetscape improvements | 1 | 2014_07 to 2014_07 | mixed | in-review |
| College Avenue Safe Routes to Transit / bike-pedestrian improvements | 2 | 2015_09 to 2016_04 | supported | approved |
| Broadway Road Diet / Rockridge Safe Routes to Transit | 1 | 2016_05 to 2016_05 | mixed | approved |