11child projects
48mentions
2003first mention
2020last mention

Why Group These

Umbrella program group for the Caldecott fourth bore and related mitigation, streetscape, road-diet, bike/pedestrian, soundwall, and Highway 24 corridor projects.

This is not a single parcel. It is a corridor-impact program where the projects are linked by Caldecott/Highway 24 impacts and mitigation.

Outcome Mix

4 proposed3 under-construction2 in-review2 approved

Child Projects

ProjectMentionsSpanStanceOutcome
Caldecott Tunnel 4th Bore232003_01 to 2010_06opposedunder-construction
Upper Broadway corridor streetscape/road diet12005_07 to 2005_07supportedproposed
Highway 24 rubberized asphalt repaving12005_10 to 2005_10supportedunder-construction
Upper Broadway bike and traffic lane redesign12006_09 to 2006_09neutralproposed
Broadway road diet and Caldecott intersection improvements122010_10 to 2020_06supportedunder-construction
SR 24 Soundwall studies42012_09 to 2013_01mixedproposed
Broadway/Keith and Broadway/Brookside/SR24 intersection improvements12013_02 to 2013_02supportedproposed
Broadway/Keith to Broadway/Golden Gate Way redesign12013_03 to 2013_03supportedin-review
Broadway road diet and streetscape improvements12014_07 to 2014_07mixedin-review
College Avenue Safe Routes to Transit / bike-pedestrian improvements22015_09 to 2016_04supportedapproved
Broadway Road Diet / Rockridge Safe Routes to Transit12016_05 to 2016_05mixedapproved