RCPC board at its February meeting accepted the Land Use Committee's recommendation and gave qualified support to the neighbors' appeal against the school's expansion from 340 to 375 students. RCPC is sending the city a letter expressing its position; the appeal is scheduled to be heard by the Planning Commission in March.
civic-institutionalmixedhighcompleted-built
6100 Broadway, Oakland
Aliases
College Prep new classroom building (6100 Broadway)College Preparatory School Facilities Master PlanCollege Preparatory School Facilities Master Plan (6100 Broadway)College Preparatory School expansion (6100 Broadway)
Timeline
2009_04College Preparatory School Facilities Master Plan (6100 Broadway)
College Preparatory School submitted a facilities master plan for about 20,000 sq ft of new construction over 10-15 years, including new classrooms and a theater building, with no planned increase in student population. RCPC and CPS co-sponsored a community meeting for review.
neutralin-reviewmedium
2009_05College Preparatory School Facilities Master Plan (6100 Broadway)
RCPC and CPS jointly sponsored a neighborhood meeting about the school's proposal to construct about 20,000 sq ft of classroom and theatre space over the next 10-15 years. The meeting was scheduled for May 6 on the CPS campus.
neutralin-reviewmedium
2009_06College Preparatory School Facilities Master Plan (6100 Broadway)
The RCPC board reviewed CPS's application at its May meeting and voted not to oppose it with conditions, but then learned of additional concerns from immediate neighbors. The comment period was extended to June 30. Contentious letters to the editor from neighbors and CPS head of school were published.
mixedin-reviewhigh
2009_07College Preparatory School Facilities Master Plan (6100 Broadway)
After discussions with CPS Head of School Murray Cohen and neighbors, RCPC sent a letter to the City outlining concerns and suggestions. RCPC continued working with the school and neighbors to reach a mutually acceptable plan.
mixedin-reviewmedium
2009_10College Preparatory School Facilities Master Plan
City staff approved modifications to College Preparatory School's use permit to accommodate a capital improvements master plan including a new performing arts center and several new classroom buildings. Plans were modified and conditions added to address neighbor concerns.
mixedapprovedlow
2009_11College Preparatory School Facilities Master Plan
A group of neighbors on streets surrounding College Preparatory School have appealed the City's decision amending the school's use permit to increase enrollment and allow additional buildings on campus. Neighbors argue the project should have required CEQA environmental review and that the approved project is too large and intrusive. RCPC is considering whether to take a position.
mixedin-reviewmedium
2009_12College Preparatory School Facilities Master Plan
Neighbors' appeal of the City's amended use permit for College Preparatory School's facilities master plan (new performing arts center, additional classroom buildings, enrollment increase) will be heard before the Oakland Planning Commission on December 16, 2009.
mixedin-reviewlow
2010_01College Preparatory School expansion (6100 Broadway)
College Preparatory School proposes a new performing arts center and classroom buildings, along with legalizing an expanded student body. Neighbors have filed appeals.
mixedin-reviewmedium
2010_02College Preparatory School expansion (6100 Broadway)
The Oakland Planning Commission unanimously denied neighbors' appeal of the College Preparatory School expansion in mid-December 2009, clearing the project to proceed.
mixedapprovedmedium
2011_11College Prep new classroom building (6100 Broadway)
College Preparatory School completed construction of a new 7-classroom building for its world languages department at its 6100 Broadway campus.
neutralcompleted-builtlow
2012_04College Preparatory School expansion (6100 Broadway)
College Preparatory School has applied for a minor conditional use permit for an expansion project. RCPC has submitted comments asking that cumulative traffic impacts along Broadway be addressed before the project is considered for approval.
mixedin-reviewlow
2012_05College Preparatory School expansion (6100 Broadway)
Decisions are still pending on the minor conditional use permit application for this private school expansion.
neutralin-reviewlow
2013_02College Preparatory School expansion (6100 Broadway)
Project to expand College Preparatory School from 340 (approved in 2009) to 375 students. The minor conditional use permit was administratively approved, but neighbors appealed to the Planning Commission. In November the Commission preliminarily voted 3-1 to grant the appeal and deny the permit. Neighbors and school are attempting to reach a compromise.
opposedin-reviewmedium
2013_03College Preparatory School expansion (6100 Broadway)
RCPC board at its February meeting accepted the Land Use Committee's recommendation and gave qualified support to the neighbors' appeal against the school's expansion from 340 to 375 students. RCPC is sending the city a letter expressing its position; the appeal is scheduled to be heard by the Planning Commission in March.
opposedin-reviewmedium
Quotes
“Since then, RCPC has learned of additional concerns from the project's immediate neighbors, and that the comment period on the application has been extended until June 30. The Land Use Committee and board are now taking another look at the project in hopes of getting agreement between CPS and its neighbors on appropriate modifications and conditions to make the project mutually acceptable before it is brought to the Planning Commission.”2009_06 - Land Use Committee report, June 2009
“The RCPC board reviewed this application at its May meeting and voted not to oppose it, so long as certain conditions are met (in particular, a prohibition on the simultaneous use of the auditorium and performing arts center for public events).”2009_06 - Land Use Committee report, June 2009
“The College Preparatory School (CPS) has submitted a proposed facilities master plan to the City. The plan outlines major construction projects for the next 10 to 15 years. The project amounts to about 20,000 sq. ft. of space, some of which would replace buildings to be demolished. The school envisions no increase in its student population.”2009_04 - Land Use Committee report, April 2009
“CPS and RCPC are jointly sponsoring a neighborhood meeting about the school's proposal to construct about 20,000 square feet of classroom and theatre space, spread out over the next 10 to 15 years. Some of the construction will replace buildings to be demolished.”2009_05 - Land Use Committee report continued from page 5, May 2009
“After discussions with both Murray Cohen, College Preparatory Head of School, and neighbors of the school, RCPC sent a letter to the City outlining its concerns with the school's proposed capital improvement master plan and suggestions about how they might be addressed. RCPC will continue to work with the school and its neighbors to reach a mutually acceptable plan.”2009_07 - Land Use Committee report, July 2009