1mentions
1987first mention
1987last mention
approvedfinal signal

Summary

Alameda County Public Works Agency planned construction of the 'Harwood Creek College Avenue Bypass' — replacing a deteriorated storm drain with 1,600 feet of reinforced concrete pipe, with construction not beginning until 1988 and expected to take about 65 days.

infrastructure-transitneutrallowapproved

College Ave from College/Chabot to College/Miles, then down Miles Ave to Forest

Aliases

College Ave flood control project (Harwood Creek Bypass)

Timeline

1987_06

College Ave flood control project (Harwood Creek Bypass)

Alameda County Public Works Agency planned construction of the 'Harwood Creek College Avenue Bypass' — replacing a deteriorated storm drain with 1,600 feet of reinforced concrete pipe, with construction not beginning until 1988 and expected to take about 65 days.

neutralapprovedlow

Quotes

The project — called the 'Harwood Creek College Avenue Bypass' — will replace a deteriorated existing reinforced concrete box storm drain with 1600 feet of reinforced concrete pipe 84 inches in diameter.1987_06 - news report